All cracks and joints between the wall and fill the old floor mounting penoy.Posle this entire area of the floor, cover the heated linseed oil or protective propitkoy.Dalshe entire floor surface processes, Betonokontaktom, causes thick, wide kistochkoy.Crazu after this treatment we put masking grid and leave until completely dry vysyhaniya.Posle grid fasten with screws to the floor, so as to ensure full adhesion to the grid again polu.I handle the entire surface betonokontaktom.Dozhdites drying and can start laying plitki.Plitku recommend lay not in paste and the cement glue for laying a perfect ATLAS +. 2Vtoroy method for tile wood pol.Vash wooden floor in poor condition but there are conditions to styazhku.Podgotovka wooden floor for tiling. 1Pervym thing to dismantle the old floor and concrete gidroizoliruem joints between walls and floors The easiest way - hammered cracks of cement-sand mixture, and then, before it dries, promazyvayut solution with liquid glass. 2Lazernym or repel the water level horizontal line on the perimeter of the room. Along this line, repel the floor level and at a distance of 90-100 cm apart and about 10 cm from the walls and expose the beacons. 3Mozhno use stucco lighthouses which are mounted on plaster stamps, or giprochnye profiles, fixed with screws to the overlap.
You can use wooden sticks, but after drying, it is desirable to remove from the tie, and close up the place of their solution. Lighthouses are set strictly on the level. Floor (concrete), pre-primed necessarily, Betonogruntom. 4Styazhka poured or cement-sand mortar (ratio: 1 part cement M-400 to 3 parts of sand scattered), or cast concrete (Recommended). Average consumption is 15 kg/m2 with a layer 1 cm. 5Rastvor interfere in a bucket capacity of at least 15 liters and, of course, by building electric mixers. 6Esli have to pour a thick layer, the first between Beacon concrete block fell asleep at a height of about 70% of the screed (lighthouses). All of this grout, and then waits for night.
7Na next day we clean the surface of expanded clay refloated, gruntuem and fill with a solution already leveling it or rule, or rack of beacons. Accordingly, we are working toward the exit. 8Cherez three days and tie gruntuem best pour self-leveling mortar. So, buckle ready to be laid tile.
You can use wooden sticks, but after drying, it is desirable to remove from the tie, and close up the place of their solution. Lighthouses are set strictly on the level. Floor (concrete), pre-primed necessarily, Betonogruntom. 4Styazhka poured or cement-sand mortar (ratio: 1 part cement M-400 to 3 parts of sand scattered), or cast concrete (Recommended). Average consumption is 15 kg/m2 with a layer 1 cm. 5Rastvor interfere in a bucket capacity of at least 15 liters and, of course, by building electric mixers. 6Esli have to pour a thick layer, the first between Beacon concrete block fell asleep at a height of about 70% of the screed (lighthouses). All of this grout, and then waits for night.
7Na next day we clean the surface of expanded clay refloated, gruntuem and fill with a solution already leveling it or rule, or rack of beacons. Accordingly, we are working toward the exit. 8Cherez three days and tie gruntuem best pour self-leveling mortar. So, buckle ready to be laid tile.

Posted by: |